Report No: 085006R-ITCEP07V04
Page: 122 of 162
10.6. Test Result
Product Personal Computer
Test Item Electrical fast transient/burst
Test Mode
Mode 1: Intel Genuine
[email protected],D-SUB
(2048*1536/60Hz) with Adapter (LI SHIN) Date of Test 2008/05/02 Test Site No.6 Shielded Room
Inject
Line
Polarity
Voltage
kV
Inject
Time
(Second)
Inject
Method
Required
Criteria
Complied
to
Criteria
Result
L-N-PE
±
1kV 60 Direct B A
PASS
LAN
±
0.5kV 60 Clamp B A
PASS
Note:
The testing performed is from lowest level up to the highest level as required by
standard, but only highest level is shown on the report.
Meet criteria A : Operate as intended during and after the test
Meet criteria B : Operate as intended after the test
Meet criteria C : Loss/Error of function
Additional Information
EUT stopped operation and could / could not be reset by operator at kV of
Line
.
No false alarms or other malfunctions were observed during or after the test.