Report No: 085006R-ITCEP07V04
Page: 90 of 162
6.4. Test Procedure
The EUT is supplied in series with power analyzer from a power source having the same
normal voltage and frequency as the rated supply voltage and the equipment under test.
And the rated voltage at the supply voltage of EUT of 0.94 times and 1.06 times shall be
performed.
6.5. Deviation from Test Standard
No deviation.
Comments to this Manuals